Module Test Working Group
Last Update: Marco Meschini 24 Mar 2005
8 Jun 2004 Meeting presentations: Orgeta-Gomez - Ring 3 production in Karlsruhe, Van Hove - R7 modules and cuts optimization, Stoye - TEC Module testing in Hamburg, Sguazzoni - I-V studies on TIB modules, Civinini - Solving problems in LT tests , Marchettini - Monitoring Production Quality: Results from TIB Production in Firenze, Neukermans - Defect Analyzer Package, Meschini - Comments on analysis tools, Tkaczyk - TOB Report (NOT PRESENTED, added after meeting) (link to Talk at Mod. Constr. Meeting, M. Meschini)
20 Apr 2004 Meeting presentations: Meschini - Introduction, Ranieri - xFLAG, Test Results and analysis in TIB Centres: My - Bari, Tricomi - Catania, Civinini - Firenze, Kaminsky - Padova, Azzurri - , De Maria - Torino, Test Results and analysis in TEC Centres: Schleper - Hamburg, Van Hove - Strasbourg, Freudenreich - Zurich
19 Mar 2004 Meeting presentations: Agenda, LT in USA, P. Gartung , TIB Layer 1 modules, R. Ranieri, Pulse Shape studies, G. Sguazzoni, Solution to I2C problems, M. Meschini, LT status, W. Beaumont, ARC, M. Poettgens, Defect Analyzer, L. Neukermans , Module Irradiation, G. Dirkes, Xml for Substrustures, J. Fernandez, (link to Talk at Mod. Constr. Meeting, M. Meschini)
10 Feb 2004 Meeting presentations: Agenda, Introduction and Overview, Pierre Van Hove, Pierre Van Hove, Wim Beaumont, Thomas Keutgen, Tony Affolder, Paul Tipton, Riccardo Ranieri, Cristiano Marchettini, Wim Beaumont, Michael Poettgens, Simone Paoletti, (link to Talk at Mod. Constr. Meeting, M. Meschini)
9 Dec 2003 Meeting presentations: Agenda, Meschini, LT in Aachen, Xcal with ARC in TEC, ARC Developments, Gartung: ARC macros with LT , Gartung: Wien boxes in US , Marchettini: LT in TIB, Affolder: US Test Status , (link to Talk at Mod. Constr. Meeting, M. Meschini)
21
Oct 2003 Meeting presentations: Agenda,
Beaumont,
Meschini,
Demaria,
Ranieri,
Dell'Orso,
Lemaitre,
Campagnari,
Mannelli,
Hartmann,
Widl,
(link to Talk
at Mod. Constr. Meeting, M. Meschini)
16
Sep 2003 Meeting presentations:
Agenda,Maenpaeae,
Paoletti,
Chabalina,
Marchettini,
Meschini,
(link to Talk
at Mod. Constr. Meeting, and Talk
at TK Gen. Meeting, M. Meschini)
15
July 2003 Meeting presentations:
Agenda,Meschini,Affolder,
Marchettini,
Beaumont
(link to Talk
at Module Construction Meeting, M. Meschini)
3 June 2003 Meeting presentations: Agenda,Meschini,Affolder, Zhukov, Poettgens, Bean, Lemaitre (link to Talk for TK Gen. Meeting, M. Meschini)
TK Week April 2003 Module Test has been integrated in L2L3 meeting: follow the LINK
25 Feb. 2003 Meeting presentations: Agenda,Meschini,Kahl, Mirabito, Militaru, Poettgens, Beaumont,Pernicka(link toTalk for Module Construction Meeting, M. Meschini)
28
Jan. 2003 Meeting presentations:
Agenda,Affolder,
Civinini,
Franke,
Van
Hove, Marchettini,
Dell'Orso,
Tkaczyk,
Olzem,
Beaumont
(link to Talkfor
Module Construction Meeting, M. Meschini)
3
Dec. 2002 Meeting presentations: Agenda
Franke,
Civinini,
Militaru,
Weiler
(link to Talk
for Module Construction Meeting, M. Meschini)
24
October 2002 "Results
with OptoHybrid Module Readout in Florence" (C. Marchettini
from OH meeting)
22
October 2002 Meeting presentations:
Meschini,
Franke,
Nowack,
Kaminsky
24
September 2002 Meeting presentations:
The LOMG TERM TEST tutorial:
Beaumont,
Zhukov
16
July 2002 Meeting presentations:
Agenda,
Meschini,
Dirkes,Demaria,
Kyriakis,
Bartalini,Albergo,Chabalina,
Olzem,
Franke,
Lounis, Wittmer
11
June 2002 Meeting presentations:
Agenda,
Meschini,
Axer,
Dirkes:
Hyb. Irradiation and MUX,
Christofek,
Giordano,
Santocchia, Beaumont
24
April 2002 Meeting presentations:
Agenda,
Meschini,
Axer,
Dirkes,
Zhukov,
Teodorescu_1,
Teodorescu_2,
Van
Hove, Demaria
5
March 2002 Meeting presentations: SW
Tools for Analisys (L. Demaria)
or
"The Macros" to be downloaded from
http://www.to.infn.it/~demaria/Test-ana/Welcome.html
Agenda,
Meschini,Dirkes,
Dell'Orso,
Poettgens,
Meschini
(presented at Gen. TK Meeting on March 6th)
Procedures
for Module Test DRAFT 2 ready for your comments !
(Not to be confused with draft
on Temporary
Procedures !)
Link
to the NEW (Dec 2002) (x)DAQ SW Installation
Guide (.html),
Old
Lyon daq Installation
Guide (.ps
) 15 Feb 2002 version
Link
to the Long Term SW
Installation in Antwerpen (more info
in testing page)
Draft
on Temporary
Procedures for Express Line Module Test (and sample
file)
Go
to the new page containing Test
Procedures and related comments
Meeting
22 January 2002 presentations:
M.
Meschini, G.
Dirkes, S.
Moreau, T.
Franke
LINK to Antwerpen news on HW, SW and DB parameters logging
meeting
5 December 2001
TSC
card ready ! M. Ageron
Status
report from Groups:
Bari,
Zurich,
Louvain,
Karlsruhe Test
box, Helsinki,
Firenze,
Aachen ARC
Developments
HW
developments:
Strasbourg
Test box
with LED's, Karlsruhe MUX,
Useful
Links for SW & HW:
setups_items:
a list of HW (by A. Cattai)
How
to install Long term SW (by W. Beaumont)
Long
term SW structure (by W. Beaumont)
Module
Test W.G. meeting, 30 October 2001,
Agenda
Presentations: First
TEC Module Tests J. Olzem, Module
Test in Pisa with CMS System S. Dutta, The
TIB carrier P. Tempesta, ARC
test system SW M. Axer
September
2001 CMS Week
Module Test W.G.
meeting, 24 September 2001
(chaired by Lino Demaria)
Presentations (the files/links
as I received them):
Strasbourg
Test Box (J. P. Ernenwein), TSC
Card (M. Ageron),
Update
on PS for test (W. Beaumont), Mux
card and LED array (T. Weiler)
Baby
Si and TEC Hybrid (F. Didierjean)
July
2001 TK Week
Module Test W.G.
meeting, 10 July 2001
Agenda,
and presentations:
Mux
card and LED
array (Dirkes), TSC and Mux in Lyon (Mirabito),
Power
Supplies for test (Beaumont), TEC
transport plate (Simonis),
TIB
transport plate (Demaria), Data
analisys for test (Zhukov),
Module
tests in Aachen (Franke), Laser board for tests (Demaria),
General
remarks (Meschini), LED
and Laser for tests (Stavistky),
List
of FED-PMC requests
--->> LINK to Lyon DAQ Guide
Module
Test W.G. meeting, 5 March 2001
Agenda,
presentations:
L.
Mirabito, N.
Marinelli, I.
Tomalin, T.
Bauer, W. Beaumont (Power
Supplies, Cold
Box)
29
JANUARY 2001, Reports from TK week
(22-26 Jan 2001)
Tracker General Meeting, Module Test Status Report (M. Meschini)
Module
Test W.G. meeting, 22 Jan 2001
PRESENTATIONS
Agenda
and Introduction, Achen,
Lyon,
Catania,
Bari,
Louvain,
Helsinki,
Pisa,Antwerpen
Link to Longterm test stations activities Antwerpen
30
OCTOBER 2000
EDR
UPDATED VERSION (30 Oct) OF THE
DOCUMENTS ON
MODULE
TEST
LONG
TERM TEST
Many changes to the documents, please have a look!
Summary
and presentations from the meeting on 28 Sep 2000
SUMMARY
Marco
Meschini
Alice
Bean
Laurent
Mirabito and Link to
Lyon
New Trigger control and Sequencer Card (18/10/2000)
Lino Demaria (missing)
S. Tkaczyk (missing)
READ
THE
COMMENTS TO THE DRAFT
Marco
Meschini presentation at the TPO on 26 Sep 2000
Detailed Summary of the meeting on 6 September 2000
Presentation
of the Aachen setup (6 Sep 2000)
Agenda
and short summary
of the meeting on 12
July 2000
#######################################
The
subgroups' documents
Lino contribution (vers. 2) Test before and after bonding
Wim, Pascal, Valery (link to updated vers. ) Burn in
Ariella
contribution (vers. 1) Quality
Assurance & C.
Ulrich contribution
(vers. 1) Hybrids
#######################################
The subgroups (as from Working
Group meeting on 12 July 2000):
Hybrid
testing: U. Goerlach + A. Honma
Module
testing before and after bonding: L. De Maria
Module
burn in: P. Vanlaer
System testing:
A. Marchioro + R. Malina + D. Abbaneo
Definition
of hardware setup for tests: W. Beaumont
Definition
of standard software tools to make results directly
comparable and data logging to the detector
database:
L. Mirabito + S. Perries +
R. Malina
Quality assurance control:
A. Cattai
OLD
STUFF
First
draft on Module Test by M. Meschini, version 0.0
Pascal
contribution Burn
in first version
Presentations from
the meeting on 12 July 2000
Other contributions from:
Manfred
Krammer
Wolfgang
Braunschweig
V.
Zhukov et. al.